What the fixture schedule tells you
Most lighting sets include a fixture schedule, either on a schedule sheet or on the lighting plans. Column names vary by engineer, but a schedule usually lists:
- Type or mark: the tag shown next to each fixture on the plan (A, A-EM, B1, X1).
- Description: troffer, downlight, linear pendant, wall pack, exit sign.
- Manufacturer and catalog number, often with approved equals.
- Source and output: lamp or LED, lumens, color temperature.
- Electrical data: wattage and voltage.
- Mounting: recessed, surface, pendant, wall.
- Notes: emergency battery, dimming, sensors, special finishes.
For the estimate, the type is the key. Every fixture you count needs a type, and every type in the schedule needs to show up somewhere in your counts or have a reason not to.
What reconciliation means
Reconciling a lighting takeoff means answering three questions:
- Is each scheduled type accounted for in the counts?
- Does each tag on the plans match a type in the schedule?
- Do the quantities by type make sense for the building?
Common mismatches
- A scheduled type with nothing counted. Often the fixtures are on a sheet you did not open, an enlarged plan, or site lighting.
- A tag on the plan that is not in the schedule. A typo, a type added by addendum, or a schedule that was not updated.
- Emergency versions counted under the normal type. An A-EM counted as an A undercounts battery packs and changes the price.
- Demolition or existing fixtures counted as new. Renovation sets often show existing and new work side by side.
- The same area counted twice, once on the floor plan and again on an enlarged plan.
- A revised schedule in an addendum that changes types or adds new ones.
A manual reconciliation checklist
- List each scheduled type, including emergency variants, in your takeoff sheet before you count.
- After counting, mark any type with a zero and search the set for its tag.
- Scan each lighting plan for tags that are not on your list.
- Compare quantities per floor: a type that appears on every floor but one deserves a second look.
- On renovation sets, read the general notes. "Existing to remain unless noted" changes what you price.
- Re-run the check after each addendum.
How InstantTakeoff reconciles counts
InstantTakeoff builds the reconciliation into the takeoff instead of leaving it for the end:
- The fixture schedule is read for types and descriptions.
- Each counted fixture is typed from the tag next to it, matched to the schedule.
- A type whose tags on the sheet have too few counted fixtures beside them is flagged for a closer look, so you know where to look.
- If the set has no readable schedule, the type tags written on the plan are used.
- Title blocks, engineer seals and demolition views are left out of the count.
- Each count is a box on the sheet, so checking a flagged type takes seconds.
Treat the flags as the start of your review, not the end: you still decide what is in scope, what is an alternate and what is existing to remain.
Pricing: $300 per seat per month, billed monthly, or $3,000 per seat per year, billed annually. See pricing.
Questions
What does fixture schedule reconciliation mean?
Checking the takeoff against the fixture schedule: each scheduled type is accounted for, each tag on the plans matches a scheduled type, and the quantities by type make sense for the job.
What does InstantTakeoff flag?
A type whose tags on the sheet have too few counted fixtures beside them gets flagged for a closer look, so you can check whether the fixtures are on a sheet you have not looked at, in an alternate, or not in this scope.
What if the set has no readable fixture schedule?
InstantTakeoff falls back to the type tags written on the plan, so fixtures are still counted by type.
Can I try the schedule check on my own drawings?
Start with one sheet: try a sheet free. The counts and any schedule types that need a closer look appear on screen, with no signup or card. For a full set and its schedule, book a demo.