
How to do a lighting takeoff, step by step
The documents to gather, the order to count in, and the check against the fixture schedule before bid day.
Guides
How to read the drawings, count the lighting and price it, written for estimators. The examples come from a real run on a public bid drawing.

The documents to gather, the order to count in, and the check against the fixture schedule before bid day.

Marks, catalog numbers, voltage, mounting and remarks: what each column means for the price and the labor.

Home-run arrows and circuit tags, branch conduit at scale, drops and conductors, from a real traced sheet.

What a fixture labor unit covers, which types need their own, and how to set units from your own job records.

Ceiling types, grid, heights and open areas: what the reflected ceiling plan changes in a lighting estimate.

Documents, schedule, counts, emergency, controls, wiring, pricing and final checks, in one printable list.